WE Report

Lessons Learned

Lessons Learned865


Operator Rig Discipline / Origin Project Phase Well Section Date What Happened

DNO
1425 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-3 HT2
Oselvar
P&A 20/04/2021
Total planned well volume was 150 m3 (tubing 50 m3, annulus 100 m3). After pumping 81 m3 the rig . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1420 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 15/04/2021 Unable to jar upper crown plug free. POOH and changed to hydraulic jar. Jarred upper crown plug free . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1421 – DNO

Borgland Dolphin Rig Intake
Own Experience
INTERNAL
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
Other 15/04/2021 When performing a joint rig intake for several operators (DNO, IOG and Wellesley) it is very time . . .

Ã…se Kristin Pettersen / Morten Laget


PDF


Edit


DNO
1419 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 11/04/2021 We pressure tested the BOP in an untraditional way using a BOP jump tool. This took very long time . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1415 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 10/04/2021 Two fingers have been torn off the protective sleeve/ retainer ring on the SSTT. One finger was . . .

Sturla Jensen / Stig Seland



PDF


Edit


DNO
1416 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 10/04/2021 Had only 1 Dolphin sub sea engineer. He had to work overtime, and OIM had to make deviation. . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1417 – DNO

Borgland Dolphin Subsea
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 10/04/2021 Heavily bending on Lubricator Umbilical approx 1,5 m from termination head for. Caused by Clamp had . . .

Sturla Jensen / Stig Seland



PDF


Edit


DNO
1413 – DNO

Borgland Dolphin Drilling
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/04/2021 Difficult to find the relevant risks in a very comprehensive risk register

Anniken Meisler / Anniken Meisler


PDF


Edit


DNO
1399 – DNO

Borgland Dolphin Drilling
Own Experience
INTERNAL
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
06/04/2021 Mail sent to IDS 15.03.21 (Monday) with set up requirements including feedback from DNO. No progress . . .

Øystein Prytz / Stig Seland



PDF


Edit


DNO
1400 – DNO

Borgland Dolphin Subsea
Own Experience
INTERNAL
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 06/04/2021 Unable to install flushing cap and URF offline, operations had to be done on rig time. Not able to . . .

Øystein Prytz / Stig Seland



PDF


Edit


DNO
1397 – DNO

Borgland Dolphin Drilling Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 05/04/2021 The DOPs was in the best intention written very detailed, with exact description of many small . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1395 – DNO

Borgland Dolphin Drilling
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 04/04/2021 Landing string got stuck after pulling 7 m. Possible stuck with SSTT at marine riser flex joint, OR . . .

Drilling Supervisor / Stig Seland



PDF


Edit


DNO
1394 – DNO

Borgland Dolphin Logistics
Own Experience
INTERNAL
Operational A-3 HT2
Oselvar
Subsea work 03/04/2021 The POB got maxed out and there were no Covid-19 emergency cabins available at the time. Also, a . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1386 – DNO

Borgland Dolphin Logistics
Own Experience
Operational A-1 H, A-2 H, A-3 HT2
Oselvar
Subsea 29/03/2021
During operations things got delayed and went missing in the transport route (Aker fuses for . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1376 – DNO

Borgland Dolphin Drilling
Own Experience
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
P&A 27/03/2021 A lot of changes in start of the operation. Change of document name, change of specific lines, . . .

Drilling Engineer / Stig Seland



PDF


Edit


DNO
1374 – DNO

Borgland Dolphin Drilling
Own Experience
INTERNAL
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
Other 19/03/2021
Extremely time-consuming compared to what we get in return. Render design (or just Pia . . .

Steinar Aarnes / Morten Laget


PDF


Edit


DNO
1085 – DNO

Borgland Dolphin C&P Planning 2/5-15
Gomez
Other 08/02/2021 Slow progress, time-consuming with changes in template/process, and receiving PO’s late. Update of . . .

Morten Laget


PDF


Edit


DNO
1062 – DNO

Island Innovator Logistics Operational 6507/7-16 S
Canela
05/02/2021 Several days with HK delay because of seastate 6 resitrictions and HTI warning. Afternoon Flight . . .

Johan Kjos-Hanssen



PDF


Edit


DNO
972 – DNO

No Rig Drilling
INTERNAL
Planning No well
Gomez
N/A 17/10/2020 No kickoff or handover to the Well Management team.

Morten Laget


PDF


Edit


DNO
1153 – DNO

Borgland Dolphin Multidicipline
Experience Transfer Meeting
Planning A-1 H, A-2 H, A-3 HT2
Oselvar
N/A 08/09/2020
Too little time for planning.
Not enough time for examination of the SSBoD.
Risks and mitigating . . .

Actions Required for Oselvar: Secure enough time for planning and optimalization – > 6 . . .
Karina Helle / Morten Laget



PDF


Edit


New Lesson Learned

You do not have permission to view this form.




\n\t\t

\n\t\t\t\n\t\t\t